Study Room | Part 2

And so Hb and I busied ourselves trying to complete the works in our study room. We bought additional inserts for the bookshelf as well as the side shelves! Here's the final outcome which we're so happy about! :)


Ohhh I also had this "brilliant" idea of creating a so-called 3D art using the various magnets we collected each time we travelled overseas. Some of them were souvenirs from friends too. 


And tadahhh... our study room's complete now! Well maybe we need proper chairs. Currently just using 2 of the chairs from our dining set. Hehehe... 

Study Room | Part 1

Hb and I finally decided to do up our study room after over 8 months of moving in. Hehehehe... So on 5-August-2013, we went to Ikea to get the following items:

Shelving unit from the Expedit series to store books, magazines and files. We initially wanted to get the 5x5 one but that only comes in normal paint and not high gloss. Fearing that it may turn yellowish over time, we decided to get the 4x4 one instead in high gloss White. Oh for a moment, we were even considering the high gloss Red one given that our study room is located in the South sector i.e. Fire element. But then we thought it was a tad too outstanding and may look overbearing once we put in our red carpet. So in the end, we went back to our initial choice.


We also bought the matching table from the same series. Colour wise it was either White or Black-Brown. We have a corner showcase unit in our study room that houses paraphernalias that we bought back overseas or collected over the years and that showcase is in Black-Brown. Therefore, Black-Brown it is for the attaching table.


Next, we also bought the 2x4 shelving unit to be placed horizontally for our printer and audio system.


Carpet wise, we took the carpet from our master bedroom; also from Ikea cos my mom gave us several larger carpets and one of them matches our master bedroom. Not forgetting, red's the colour we need for the study room in the South sector.


We could've paid Ikea for the delivery and installation / assembly but HB insisted that it will be a piece of cake (wife is skeptical of course, hahaha) and proceeded to try and load all the above into our car. Thank goodness they all fit.

Next up... how they all fit together in the study room... :)

Happy New Year!

We've been so busy with the new house that I totally forgot about my new year resolutions! So here goes...

1. Make More Money
2. Make Babies
3. Make Time

Top 3 priorities this year.

More money, cos' we spent a bomb on our house renovation and furniture. It's time to replenish our savings! Also cos ahem, we've got lots of wish lists for the house still! :)

Make babies, been married 3 years. In the past we only live together on weekend. Now that we have moved to this new place, we are finally living like a normal married couple. Supposed it's high time to make babies!!! :))

Make time, for things that matter. There's 24 hours in a day. And yet we often lament that there's just not enough time. While I am juggling career and personal life, I would seriously like to make time for my parents (not like I'm not doing it now but more of it since we now live 6 units apart), for myself to discover hidden passion(s) that I may have and for my hubby! :)))

So ya! Top 3 resolutions for 2013! Happy New Year!!!

New Year, New House

Several things about moving to a new house...

Switches
Not entirely sure which switch is tied to which lighting or fan or aircond... That often all the lights and fans in the house is on... hehe...

Keys
While it's easy to figure out the main keys of the house, the sub keys are the hardest to figure out cos they all look the same.

New Hob
Everyone seemed to be able to on my new hob except me. Hmmm...

Sweeping & Cleaning
After renovation, the entire place is full of dusts! Even after mopping numerous rounds, it still felt powdery!!!

Nevertheless, slowly figuring them out with Hb... :))
Here's a snapshot of our house. Several pending items still:


TV Panel
  • Doors not fitted yet
  • Surface to be polished
  • Missing drawer to be installed
  • Holes to hide home theater wires
  • Astro installation
  • Fan & middle row of downlights seemed connected to the same switch!

Dining Room
  • Painting to be installed

Dry Kitchen
  • Missing door to be installed
  • Fridge to be delivered

Wet Kitchen
  • Grills to be installed
  • Additional partition for tall cabinet

Study Room
  • Not a single item done yet!

Family Hall
  • TV, home theatre & DVD player to be connected
  • Astro to be installed

Master Bedroom
  • Wardrobe clothes rail, 2 missing
  • Toilet flush not working
As you can see, there are still tonnes to be done! :)

Move In Ceremony

Prior to moving in, Hb and I got the move in date selected by Kok.Chong.Ming. There were several dates provided. However not all suited our renovation schedule / leave plans so we were left with only 1 choice i.e. 31-December-2012 (Monday) which also coincides with my parents & brother's move in date to their unit! Lucky thing their timing was earlier i.e. between 5am-7am and ours was between 9am-11am. Which meant that I was able to help out at my parents' house first before moving in to my own house. Lucky thing both our units are on the same row!!!

Here are the list to-dos that we were told to follow for the move in ceremony:
  • Before time to move in, hang red cloth at the entrance
  • Auspicious time, at the car porch, light pot of charcoal
  • Make sure it's burning red (pili palak)
  • Patriarch to shout: "San Ook Yup For", "Tai Kat Tai Lei", "Heng Ah", "Huat Ah"!!!
  • Patriarch while holding pot of burning charcoal step into the house with LEFT leg NOISILY!
  • Take the charcoal pot straight into the kitchen! Don't stop, don't turn back
  • Then patriarch to get god statues from the car and tell the gods (facing the sky) - Today we "sun ook yup for, cheng (god's name) into our new home" then put god statues on altar
  • Patriarch to add 'ang pow' of RM12 at the bottom of the rice urn. Rice to be 80% full. Carry into the kitchen
  • Sequence: > Patriarch: S&P, bank books, cash, jewelry, marriage certificates in pockets > Matriarch: Pillow, cash, jewelry & oil, salt, sauce, vinegar & tea leaves > Son: Marriage cert, bank book, cash, jewelry
  • Open all the windows and doors. Switch on lights, on taps!
  • Boil sweet dessert. After eating, everybody to say "hou tim"!!!
  • All to take bath and change into new clothes!
  • Start praying!
  • Change bed sheet
  • Sprinkle tea leaves, salt and rice and leave for 3 days!
  • Move old furniture in!


More on this later as it was an important day for us all! :)
In the meantime, read about how we got the dates in the first place here.

Reno Update T-2

Happy to say that at the eleventh hour i.e. 7-ish, place was thoroughly cleaned! Thank gawd my father managed to get the painter to drive our rubbish away (the stupid garbage man collected the giant garbage bin a day ahead of schedule)!

Update as at 11pm:

Living Room
  • TV panel doors not installed yet
  • TV!!! Have not purchased a TV yet!!!
  • Sofa was delivered at 10pm!!!
  • Need to get an additional 1-seater!
  • Curtains tracks up
  • To hang curtains before moving in
  • Windows cleaned
  • To put in plug points

Dining Room
  • Crystal lighting bought & installed!
  • Dining set to be delivered by movers
  • Feature mirror! To buy!!!

Dry Kitchen
  • Sink & taps installed
  • To install pendant lights
  • To install drawers
  • To install backsplash mirror!
  • Fridge to come on Mon / Tue

Wet Kitchen
  • Sink & taps installed
  • To install handles
  • To complete door installation
  • To put on hob
  • Hood to come on Wed / Thu

Altar Hall
  • Lights bought and installed!
  • Wall painted!
  • Pending altar delivery
  • Pending god statue purchase & activation

Master Bedroom
  • Bed & mattress delivered
  • Side table delivered
  • Pending bedsheet set!

Toilets
  • Lights installed
  • To buy mirrors for toilets

Staircase
  • Lights bought and installed!

OK OK, breathe, breathe... still got time...

Reno Update

On the final renovation day (workers can't work on Saturday), everything single corner is still work-in-progress!!! Update as at 12.11pm:

Living Room
  • TV panel not polished yet
  • Doors not fitted yet
  • LED lights not installed

Dining Room
  • Lighting not up yet

Dry Kitchen
  • Middle backsplash mirror not up yet
  • Breakfast bar mirror not up yet
  • Cabinet doors not installed yet
  • Bar lighting not installed yet

Wet Kitchen
  • Still installing the cabinets frame
  • Doors not up yet

Altar Wall
  • Still painting

Rooms
  • Pending colour change

Stress level is extremely high for everyone involved. I am so worried that the place will not be ready for our move in day!!!